Concept illustration of a containerised battery energy storage facility
INDEPENDENT THINKING. INTEGRATED STORAGE.HYDERABAD, INDIA

Energy, ready
when it matters.

Battery energy storage. Expertly engineered.
From grid-scale infrastructure to the industries
and solar projects powering India.

BESS EPCM ASSET OWNERSHIP IN-HOUSE EMSConcept visual · representative infrastructure

THE AADHARA APPROACH

One specialist.
Every stage of storage.

Good storage starts with the right questions. We bring project engineering, execution management and an owner’s perspective together, so every decision supports the way your asset will operate.

01 / ENGINEER

From ambition
to an executable plan.

Engineering, procurement and construction management (EPCM) aligned with your use case, site conditions and project economics.

Explore our EPCM approach
02 / OWN

An asset owner’s
point of view.

Alongside EPCM, Aadhara owns BESS assets. That perspective keeps lifecycle performance, operating readiness and long-term value central to our work.

Our ownership philosophy
03 / CONTROL

Intelligence at
the heart of the system.

Our in-house EMS through Myto Energy connects the storage project with its control strategy, with the integration scope shaped around your site.

Meet the control layer

PURPOSE-BUILT SOLUTIONS

Different energy needs.
The same storage focus.

See all solutions
FOR UTILITIES, DEVELOPERS & ASSET OWNERS

Flexible capacity.
Stronger power systems.

Shape dispatchable storage around the grid connection, offtake requirements and operating duty. Integrate power conversion, protection, controls and balance of plant into one coordinated project.

Explore grid-scale BESS
01

Energy shifting & peak delivery

02

Renewable integration

03

Grid-support functions, where specified

A CONNECTED TECHNOLOGY VISION

From the cell
to the control room.

Hardware and intelligence belong in the same conversation.

With in-house EMS through Myto Energy and an assembly line planned around 314 Ah and 560 Ah cell formats, we are building a connected foundation for BESS delivery.

Explore our technology
01 / ENERGY LAYER

314 Ah / 560 Ah

Cell formats in our planned assembly roadmap

PLANNED CAPABILITY
02 / CONTROL LAYER

Myto Energy

Our in-house energy management system

Visit myto.energy

CLARITY AT EVERY STEP

Move forward with a plan.

From the first feasibility discussion to operational handover, define the decisions, interfaces and responsibilities that make a storage project work.

01

Understand

Application, site, load profile, grid connection and commercial objectives.

02

Engineer

Power and energy sizing, system architecture and performance requirements.

03

Coordinate

Vendor evaluation, procurement, construction interfaces and commissioning plans.

04

Enable operations

Controls integration, acceptance criteria, documentation and handover.

START A CONVERSATION

Let’s put your energy to work.

Tell us what you want storage to achieve. We’ll help shape the right project.

Discuss your project