Engineering
Feasibility inputs, sizing, electrical architecture, plant layout and technical specifications.
OUR SOLUTIONS
A clear application. A coordinated system. A plan for the full asset lifecycle.
For utilities, independent power producers and project developers building flexible energy infrastructure.
We coordinate BESS engineering around the project’s connection point, power rating, discharge duration and contractual obligations. The result is a system scope that covers the battery and the infrastructure around it.
For factories, commercial facilities and campuses with real operating priorities.
We use your demand profile, electricity tariff and on-site generation to evaluate a practical BESS configuration. The priority is to align the investment with the way your facility actually consumes power.
Backup and seamless transfer require suitable PCS capability, isolation, protection and switching. These are engineered explicitly for each site.
Discuss your facilityA BESS specialist for solar EPCs, developers and asset owners.
Bring us in at concept stage or when extending an existing solar installation. We help define the battery scope, the solar-storage interface and a coordinated execution plan.
ENGINEERING. PROCUREMENT. CONSTRUCTION MANAGEMENT.
We organise the technical and execution interfaces that sit between project intent and an operating asset. Contract scope and responsibilities are agreed for each engagement.
Feasibility inputs, sizing, electrical architecture, plant layout and technical specifications.
Technical bid alignment, vendor evaluation and equipment-interface coordination.
Execution planning, site coordination, quality checkpoints and commissioning readiness.
Acceptance requirements, control-system integration and project documentation.
BESS SIZE EXPLORER
Explore the basic relationship between power, discharge duration and energy. Use your starting configuration to begin a project discussion.
Illustrative arithmetic, not a system design or output guarantee. Final nameplate sizing must account for usable SOC, conversion losses, auxiliaries, degradation, temperature and the contractual measurement point.
MWh
25 MW × 4 hours = 100 MWhEnter a power from 0.1 to 1,000 MW in increments of 0.1.
Discuss this configurationUSEFUL TO KNOW
MW measures power: the rate at which a battery charges or discharges. MWh measures energy. Delivering 25 MW for four hours requires 100 MWh at the stated measurement point. Installed battery capacity may need to be higher to meet that delivery requirement.
Yes. Aadhara can coordinate the BESS scope with your solar EPC and other project teams, with responsibilities and technical interfaces agreed before execution.
It can when the complete installation is designed for that function. Islanding, grid-forming capability where required, changeover equipment and protection must be specified. A standard grid-connected BESS does not automatically provide backup.
Start with the site location, use case, desired commissioning date and any target MW/MWh. For C&I projects, electricity bills and interval load data are useful. For solar projects, share plant capacity, generation data and the existing single-line diagram if available.
They depend on tariffs, charging cost, efficiency, operating duty, availability, degradation, financing and applicable grid arrangements. We start with project-specific inputs rather than a universal payback claim.
START A CONVERSATION
Peak capacity, solar integration or facility energy management: tell us your priority.