Battery + BMS
Energy storage, cell supervision and battery operating limits.
TECHNOLOGY & INTEGRATION
Battery systems, power conversion and intelligent control, aligned with the project’s operating purpose.
OUR IN-HOUSE EMS · MYTO ENERGY
Bring the control strategy into the project from day one.
Aadhara’s in-house energy management system is delivered through Myto Energy. We bring the EMS conversation together with battery sizing, power-conversion choices and site integration.
Monitoring points, dispatch requirements, communications and supervisory controls are defined against the project’s operating scope.
Explore Myto EnergyENGINEERING THE INTERFACES
Each layer has a clear role. Coordinating their interfaces is how a storage installation becomes a useful energy asset.
Energy storage, cell supervision and battery operating limits.
Bidirectional conversion and specified electrical performance.
Transformers, switchgear, protection, metering and connection works.
Supervisory strategy and interfaces with the site’s wider systems.
Conceptual system layers. Detailed architecture, safety systems and equipment specifications are established through project engineering.
BUILDING OUR NEXT CAPABILITY
Aadhara is planning its own battery assembly line around 314 Ah and 560 Ah cell formats, extending our focus across storage hardware and system integration.
Part of the planned assembly programme.
Part of the planned assembly programme.
Final equipment, products, production capacity and commissioning timeline will be announced as the programme develops.
Discuss a technology partnershipSPECIFY WHAT MATTERS
We structure technical discussions around measurable project needs and clear responsibilities across the system.
Usable energy, charge/discharge power, throughput, operating windows and lifetime assumptions.
Thermal management, detection, protection coordination and site emergency planning.
Communications, controls, grid interfaces and agreed performance-verification procedures.
START A CONVERSATION
Let’s connect your operating requirements with the right storage architecture.