OUR SOLUTIONS

Storage, shaped
around your world.

A clear application. A coordinated system. A plan for the full asset lifecycle.

01GRID SCALE

Storage for a changing grid.

For utilities, independent power producers and project developers building flexible energy infrastructure.

We coordinate BESS engineering around the project’s connection point, power rating, discharge duration and contractual obligations. The result is a system scope that covers the battery and the infrastructure around it.

Applications

  • Time-shifting energy and delivering at peak hours
  • Integrating renewable generation
  • Grid-support services where approved and specified

Engineering focus

  • Point-of-interconnection performance
  • PCS, transformers, switchgear and protection
  • Duty cycle, availability and lifecycle requirements
Talk to us about grid-scale storage
02COMMERCIAL & INDUSTRIAL

Make energy work for your business.

For factories, commercial facilities and campuses with real operating priorities.

We use your demand profile, electricity tariff and on-site generation to evaluate a practical BESS configuration. The priority is to align the investment with the way your facility actually consumes power.

Applications

  • Managing peak demand
  • Shifting energy across eligible tariff periods
  • Increasing on-site solar consumption

Engineering focus

  • Interval load data and sanctioned demand
  • Critical-load selection and switchgear interfaces
  • Space, ventilation, access and safety strategy

Backup and seamless transfer require suitable PCS capability, isolation, protection and switching. These are engineered explicitly for each site.

Discuss your facility
03SOLAR + STORAGE

Your solar expertise.
Our storage focus.

A BESS specialist for solar EPCs, developers and asset owners.

Bring us in at concept stage or when extending an existing solar installation. We help define the battery scope, the solar-storage interface and a coordinated execution plan.

Where we fit

  • Storage scope for solar-plus-BESS proposals
  • New installations and retrofit assessment
  • Coordinated EMS integration

What we align

  • AC- or DC-coupled architecture, as suitable
  • Charging windows and the intended delivery profile
  • Interfaces between EPC, OEMs and site teams
Explore a solar partnership

ENGINEERING. PROCUREMENT. CONSTRUCTION MANAGEMENT.

The entire project.
Seen as one system.

We organise the technical and execution interfaces that sit between project intent and an operating asset. Contract scope and responsibilities are agreed for each engagement.

01

Engineering

Feasibility inputs, sizing, electrical architecture, plant layout and technical specifications.

02

Procurement

Technical bid alignment, vendor evaluation and equipment-interface coordination.

03

Construction management

Execution planning, site coordination, quality checkpoints and commissioning readiness.

04

Operational handover

Acceptance requirements, control-system integration and project documentation.

BESS SIZE EXPLORER

Power sets the pace.
Energy sets the duration.

Explore the basic relationship between power, discharge duration and energy. Use your starting configuration to begin a project discussion.

Illustrative arithmetic, not a system design or output guarantee. Final nameplate sizing must account for usable SOC, conversion losses, auxiliaries, degradation, temperature and the contractual measurement point.

0.1–1,000 MW · 1 MW = 1,000 kW
Discharge duration
ENERGY AT THE SPECIFIED POWER

100 MWh

25 MW × 4 hours = 100 MWh
Discuss this configuration

USEFUL TO KNOW

Before the
first conversation.

What is the difference between MW and MWh?

MW measures power: the rate at which a battery charges or discharges. MWh measures energy. Delivering 25 MW for four hours requires 100 MWh at the stated measurement point. Installed battery capacity may need to be higher to meet that delivery requirement.

Can you work alongside our solar EPC?

Yes. Aadhara can coordinate the BESS scope with your solar EPC and other project teams, with responsibilities and technical interfaces agreed before execution.

Can BESS provide power during a grid outage?

It can when the complete installation is designed for that function. Islanding, grid-forming capability where required, changeover equipment and protection must be specified. A standard grid-connected BESS does not automatically provide backup.

What information should we share first?

Start with the site location, use case, desired commissioning date and any target MW/MWh. For C&I projects, electricity bills and interval load data are useful. For solar projects, share plant capacity, generation data and the existing single-line diagram if available.

How are savings or project returns assessed?

They depend on tariffs, charging cost, efficiency, operating duty, availability, degradation, financing and applicable grid arrangements. We start with project-specific inputs rather than a universal payback claim.

START A CONVERSATION

Start with the outcome.

Peak capacity, solar integration or facility energy management: tell us your priority.

Discuss your project